Client Requirements:
Client contacted Stratquip to provide a solution to dewater a dormant coal pit within the tight project time frames. This project required working with existing site infrastructure to pump across a 5 km pipeline into an alternative water storage facility.
Location:
Coal mine
Stratquip’s Response:
Following a site assessment Stratquip recommended an automated high flow, high head staged pumping system; which allowed for minimal operator input.
The Outcome:
Stratquip supplied a high flow, high head initial feed pump and a high flow, high head automatically operated boost pump to overcome the high demands on site infrastructure resulting from the projects requirements and timeframes.
Client’s Comments:
“Having never stage pumped before I was nervous, but this system worked without flaw.” —Project Engineer