Water & Silt Separation Project

Project Details

Client Requirements:

Client was looking for a solution to remove silt from the mine infrastructure water supply. The solution needed to be deployed to site quickly to meet the urgent site water requirements.

Location:

Coal mine

Stratquip’s Response:

After reviewing the site, Stratquip worked with the client to supply a complete silt separator system to remove solids and silt from the water supply for the mine infrastructure.

The Outcome:

Stratquip rapidly deployed the equipment to site enabling the project to be installed and meet the needs of the client within the short timeframe.

Client’s Comments:

“We can now continue to operate with a suitable water supply.” —Project Engineer